Difference between revisions of "Qweak Installation"
Jump to navigation
Jump to search
Line 50: | Line 50: | ||
| Pitch (about X) || || || | | Pitch (about X) || || || | ||
|- | |- | ||
− | | Roll(about Z) || || || | + | | Roll(about Z) || <math>\infty</math> || <math>\infty</math> || <math>\infty</math> |
|} | |} | ||
[http://www.iac.isu.edu/mediawiki/index.php/Qweak Go Back] | [http://www.iac.isu.edu/mediawiki/index.php/Qweak Go Back] |
Revision as of 14:20, 20 May 2008
Information for installing the R1 chambers into Hall C
Target Installation Date
The target date to install the R1 chambers in Hall C is
Definitions
- Survey tolorance
- The accuracy in the absolute location of an object
- Alignment Tolerance
- The accuracy of an object relative some other known object.
- "Would like to"
- desired alignment accuracy
- "Must have"
- Required alignment accuracy
- "Known to"
- desired survey accuracy
Tolorances
The charge collector strips are less than 0.4 mm wide. The concentric strips can give you a direct measurement of the electron scattering angle
if they are properly alignment with the beam line.
The numbers below are just a Guess with no justification from a simulation or hand calculation.
Tolorance for GEM relative to the beam line center
Coordinate | "Would like to" | "Must have" | Known to |
(mm) | (mm) | (mm) | |
X | 0.2 | 0.4 | 0.2 |
Y | 0.2 | 0.4 | 0.2 |
Z | 1 | 10 | 1 |
Yaw(about Y) | |||
Pitch (about X) | |||
Roll(about Z) |