Difference between revisions of "Experimental setup"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
Collimator parameters: in upstream side of wall 5/8 <math>\rightarrow</math> 3/4", in downstream side of wall 1/2". | Collimator parameters: in upstream side of wall 5/8 <math>\rightarrow</math> 3/4", in downstream side of wall 1/2". | ||
− | [[Image:exp_setup1_1.jpg | + | [[Image:exp_setup1_1.jpg]] |
'''Figure 1''': 8:21 am - <math>40 mAmps</math> pulse, 200 ns, 300 Hz, <math>10^3 secs</math> of beam, 6 fissions. 9:10 am - Threshold 80 mV, <math>N_{T1} = 17.6 counts/10 min</math>. | '''Figure 1''': 8:21 am - <math>40 mAmps</math> pulse, 200 ns, 300 Hz, <math>10^3 secs</math> of beam, 6 fissions. 9:10 am - Threshold 80 mV, <math>N_{T1} = 17.6 counts/10 min</math>. |
Revision as of 18:30, 18 April 2008
Collimator parameters: in upstream side of wall 5/8
3/4", in downstream side of wall 1/2".Figure 1: 8:21 am -
pulse, 200 ns, 300 Hz, of beam, 6 fissions. 9:10 am - Threshold 80 mV, .Figure 2:
, , , , . , . Geometrical dimensions for detector placement and chamber size are the same as in Figure 1.Figure 3:
, , , , . , threshold = 80 mV, . Geometrical dimensions for detector placement and chamber size are the same as in Figure 1.Figure 4:
, , , , . , , threshold = 80 mV, . Geometrical dimensions for detector placement and chamber size are the same as in Figure 1.Figure 4: This new architecture is used for obtaining timing spectra during runs 60 - 63 (http://www.iac.isu.edu/mediawiki/index.php/Timing_spectra), , .
Figure 5: Beam produces nuclear fragments on http://www.iac.isu.edu/mediawiki/index.php/Energy_spectra_%28fiss_frag%29).
and Al and fission fragments on . P = 4.96 Torr (heptane), (beam off), (beam on!). Chambers are not stable due to vacuum leak. If nothing was changed this geometry was used to get all the energy spectra (Figure 6: ADC distributions of
(left) and (right). Data obtained via experimental setup shown in Figure 5.