Difference between revisions of "Experimental setup"
Jump to navigation
Jump to search
| Line 24: | Line 24: | ||
[[Image:exp_setup6.jpg]] | [[Image:exp_setup6.jpg]] | ||
| − | '''Figure 5''': Beam produces nuclear fragments on <math>C^{12}</math> and Al and fission fragments on <math>U^{235}</math>. P = 4.96 Torr (heptane), <math>N_{T1} \sim 4.6/100 sec</math> | + | '''Figure 5''': Beam produces nuclear fragments on <math>C^{12}</math> and Al and fission fragments on <math>U^{235}</math>. P = 4.96 Torr (heptane), <math>N_{T1} \sim 4.6/100 sec</math> (beam off), <math>N_{T1} \sim 2.75/100 sec</math> (beam on!). Chambers are not stable due to vacuum leak. |
Revision as of 16:54, 17 April 2008
Collimator parameters: in upstream side of wall 5/8 3/4", in downstream side of wall 1/2".
Figure 1: 8:21 am - pulse, 200 ns, 300 Hz, of beam, 6 fissions. 9:10 am - Threshold 80 mV, .
Figure 2: , , , , . ,
Figure 3: , , , , . , threshold = 80 mV,
Figure 4: , , , , . , , threshold = 80 mV,
Figure 4: This new architecture is used for obtaining timing spectra during runs 60 - 63 (http://www.iac.isu.edu/mediawiki/index.php/Timing_spectra), , .
Figure 5: Beam produces nuclear fragments on and Al and fission fragments on . P = 4.96 Torr (heptane), (beam off), (beam on!). Chambers are not stable due to vacuum leak.





