Difference between revisions of "IAC 2-29-08"
Jump to navigation
Jump to search
| Line 23: | Line 23: | ||
[http://www.iac.isu.edu/mediawiki/index.php/Mini-prototype#IAC_Runs Go Back] | [http://www.iac.isu.edu/mediawiki/index.php/Mini-prototype#IAC_Runs Go Back] | ||
| + | = Beam Line Configuration= | ||
| + | |||
| + | A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall. A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser. A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle. A coincidence is required between the two scintillators. | ||
Revision as of 15:22, 29 February 2008
Leap Day run
DC setup
This time the Sense wire HV is set to 1500 to start
90/10 ArCo2
| HV settings | ||
| Wire | Volts | current (A) |
| Sense | 1500 | |
| Field | -750 | |
| Guard | 750 | |
DC preamp at 5.6 Volts
Beam Line Configuration
A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall. A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser. A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle. A coincidence is required between the two scintillators.