Difference between revisions of "CLAS12 R1"

From New IAC Wiki
Jump to navigation Jump to search
Line 14: Line 14:
  
 
[[Image:CLAS_R1_atI_AC_conferenceRoom.jpg | 200 px]]
 
[[Image:CLAS_R1_atI_AC_conferenceRoom.jpg | 200 px]]
 +
 +
<math>\frac{7\% change in tension}{6 Degree Farenheit}</math>
  
 
=R1 Construction preparations=
 
=R1 Construction preparations=

Revision as of 08:16, 3 June 2008

IAC Facility

16' high 26 ' deep 17 ' wide

Door:

9'8" high 12' wide


Below is a picture of the current conference room at the IAC which will be removed and replaced with a clean room very similar in design to ODU's.

CLAS R1 atI AC conferenceRoom.jpg

[math]\frac{7\% change in tension}{6 Degree Farenheit}[/math]

R1 Construction preparations

Discussion items

1.) Budget

  • JLab to ISU travel for JLab personnel to inspect operations
  • shipping container for R1 chambers

2.) Clean room

cost =

assume we copy the ODU clean room

Using IAC conference room space, need to remove carpet and paint floor.


3.) hiring timeline

9/08 NSF proposal submission

4.) stringing platform and DC stringing support arm

5.) Manpower

6.) MOU to support post doc request or faculty release time

7.) Stringing equipment

a.) crimping tool

b.) glue

c.) wire or feedthroughs?

d.) wire tension measurement (PC, Magnets, associated electronics



A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. CLAS12_R1_Prototype_9-16-07

The air actuated crimping tool:

Air Actuated R1 CrimpingTool.jpg


CLAS12_R1_Prototype_2-20-08