CLAS12 R1: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Oborn (talk | contribs)
No edit summary
Oborn (talk | contribs)
Line 1: Line 1:
=IAC space=
=IAC space=


[[Image:CLAS_R1_atI_AC_conferenceRoom.jpg]]
[[Image:CLAS_R1_atI_AC_conferenceRoom.jpg | 200 px]]


=R1 Construction preparations=
=R1 Construction preparations=

Revision as of 15:02, 2 June 2008

IAC space

R1 Construction preparations

Discussion items

1.) Budget

  • JLab to ISU travel for JLab personnel to inspect operations

2.) Clean room

cost =

assume we copy the ODU clean room

Using IAC conference room space, need to remove carpet and paint floor.


3.) hiring timeline

9/08 NSF proposal submission

4.) stringing platform and DC stringing support arm

5.) Manpower

6.) MOU to support post doc request or faculty release time

7.) Stringing equipment

a.) crimping tool

b.) glue

c.) wire or feedthroughs?

d.) wire tension measurement (PC, Magnets, associated electronics



A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. CLAS12_R1_Prototype_9-16-07

The air actuated crimping tool:


CLAS12_R1_Prototype_2-20-08