Difference between revisions of "CLAS12 R1"

From New IAC Wiki
Jump to navigation Jump to search
Line 10: Line 10:
  
 
cost =  
 
cost =  
 +
 +
assume we copy the ODU clean room
 +
 +
Using IAC conference room space,  need to remove carpet and paint floor.
  
  

Revision as of 14:54, 2 June 2008

R1 Construction preparations

Discussion items

1.) Budget

  • JLab to ISU travel for JLab personnel to inspect operations

2.) Clean room

cost =

assume we copy the ODU clean room

Using IAC conference room space, need to remove carpet and paint floor.


3.) hiring timeline

9/08 NSF proposal submission

4.) stringing platform and DC stringing support arm

5.) Manpower

6.) MOU to support post doc request or faculty release time

7.) Stringing equipment

a.) crimping tool

b.) glue

c.) wire or feedthroughs?



A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. CLAS12_R1_Prototype_9-16-07

The air actuated crimping tool:

Air Actuated R1 CrimpingTool.jpg


CLAS12_R1_Prototype_2-20-08