R1 Construction preparations
Discussion items
1.) Budget
- JLab to ISU travel for JLab personnel to inspect operations
2.) Clean room
cost =
3.) hiring timeline
9/08 NSF proposal submission
4.) stringing platform and DC stringing support arm
5.) Manpower
6.) MOU to support post doc request or faculty release time
7.) Stringing equipment
a.) crimping tool b.) glue c.) wire or feed throughs?
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. CLAS12_R1_Prototype_9-16-07
The air actuated crimping tool: