CLAS12 R1: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
=R1 Construction preparations= | |||
1.) Budget | |||
2.) Clean room | |||
3.) hiring timeline | |||
9/08 NSF proposal submission | |||
4.) stringing platform and DC stringing support arm | |||
5.) Manpower | |||
6.) MOU to support post doc request or faculty release time | |||
7.) | |||
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. | A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. | ||
[[CLAS12_R1_Prototype_9-16-07]] | [[CLAS12_R1_Prototype_9-16-07]] | ||
Revision as of 14:45, 2 June 2008
R1 Construction preparations
1.) Budget
2.) Clean room
3.) hiring timeline
9/08 NSF proposal submission
4.) stringing platform and DC stringing support arm
5.) Manpower
6.) MOU to support post doc request or faculty release time
7.)
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall.
CLAS12_R1_Prototype_9-16-07
The air actuated crimping tool: