CLAS12 R1: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Oborn (talk | contribs)
No edit summary
Oborn (talk | contribs)
No edit summary
Line 1: Line 1:
=R1 Construction preparations=
1.) Budget
2.) Clean room
3.) hiring timeline
9/08  NSF proposal submission
4.) stringing platform and DC stringing support arm
5.) Manpower
6.) MOU to support post doc request or faculty release time
7.)
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07.  It is about 6 feet tall.
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07.  It is about 6 feet tall.
[[CLAS12_R1_Prototype_9-16-07]]
[[CLAS12_R1_Prototype_9-16-07]]

Revision as of 14:45, 2 June 2008

R1 Construction preparations

1.) Budget

2.) Clean room

3.) hiring timeline


9/08 NSF proposal submission


4.) stringing platform and DC stringing support arm

5.) Manpower

6.) MOU to support post doc request or faculty release time

7.)



A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. CLAS12_R1_Prototype_9-16-07

The air actuated crimping tool:


CLAS12_R1_Prototype_2-20-08