Difference between revisions of "CH Weekly Reports"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
* Investigated non-linearity of peak sensing ADC due to issues arising in energy calibrations and efficiency measurements. | * Investigated non-linearity of peak sensing ADC due to issues arising in energy calibrations and efficiency measurements. | ||
− | * Modified existing calibration code to use non-linear regression | + | * Modified existing calibration code to use non-linear regression to account for ADC |
+ | |||
+ | * Sourced material needed for CaGaS Phase II setup | ||
+ | |||
+ | * Calculated ADC dead time for live-time correction to efficiency measurement count rates | ||
Revision as of 18:09, 22 September 2022
09/19/22
- Investigated non-linearity of peak sensing ADC due to issues arising in energy calibrations and efficiency measurements.
- Modified existing calibration code to use non-linear regression to account for ADC
- Sourced material needed for CaGaS Phase II setup
- Calculated ADC dead time for live-time correction to efficiency measurement count rates