CH HPGe Electronics Chain: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Harpconn (talk | contribs)
Created page with " ---- PAS Feasibility Study Runs"
 
Harpconn (talk | contribs)
No edit summary
Line 1: Line 1:
HPGe -> Split signal using BNC T junction


-> First line to spec amp -> peak sensing ADC


-> Second line to timing/filter amp with ~2.3x amplification (also inverts)
--> Discriminator (Blue lecroy model #xxxx)
---> Top of dual timer then into bottom of dual timer
---->





Revision as of 17:46, 20 December 2021

HPGe -> Split signal using BNC T junction

-> First line to spec amp -> peak sensing ADC

-> Second line to timing/filter amp with ~2.3x amplification (also inverts)

--> Discriminator (Blue lecroy model #xxxx)

---> Top of dual timer then into bottom of dual timer


>




PAS Feasibility Study Runs