=='''7/19/21'''==
=='''7/19/21'''==


{| class="wikitable"  
{| class="wikitable mw-collapsible mw-collapsed" border="2" style="text-align:center;" |cellpadding="20" cellspacing="1
|+ NaI Detector, 5mV threshold, +1000V on detector
|+ NaI Detector, 5mV threshold, +1000V on detector
|-
|-

Revision as of 19:35, 19 July 2021

This experimental setup does not contain BorAl

General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
  • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
  • Move the source to different locations along the source tunnel and plot the different distances and count rates

I will upload some models of the setup when I have updated the model to include the source and detector

7/19/21

NaI Detector, 5mV threshold, +1000V on detector
Source Distance from Intersection (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5





PAS Feasibility Study Runs