Difference between revisions of "PAS Thermalizing Box Design"
Jump to navigation
Jump to search
Line 76: | Line 76: | ||
|+ Feasibility setup | |+ Feasibility setup | ||
|- | |- | ||
− | | [[File:PAS Feasibility 1.jpg|300px|thumb|center|]] || [[File:PAS Feasibility 2.jpg|300px|thumb|center|]] | + | | [[File:PAS Feasibility 1.jpg|300px|thumb|center|Looking down the detector tunnel towards the converter]] || [[File:PAS Feasibility 2.jpg|300px|thumb|center|Overview of the setup with detector tunnel extending to the right and the source tunnel extending towards the back of the image]] |
|- | |- | ||
− | | [[File:PAS Feasibility 3.jpg|300px|thumb|center|]] || [[File:PAS Feasibility 4.jpg|300px|thumb|center|]] | + | | [[File:PAS Feasibility 3.jpg|300px|thumb|center|The backside of the source tunnel with regular poly exposed]] || [[File:PAS Feasibility 4.jpg|300px|thumb|center|Top view of the source tunnel with poly present as a stability measure for lead bricks stacked on end]] |
|} | |} | ||
Revision as of 16:30, 19 July 2021
3D Models
For all models:
- Red - Lead brick
- White - Regular poly
- Green - Borated Poly
7/6/21
This design is preliminary and subject to change. No BorAl shielding has been included.
7/12/21
7/14/21
Poly Bricks for Setup
Poly Base
- 4X (4" x 2" x 6")
- 2X (4" x 2" x 7")
Poly Outside Wall
- 1X (4" x 2" x 7")
- 1X (4" x 2" x 6")
- 2X (4" x 2" x 8")
Poly Inside Wall
- 1X (4" x 2" x 3")
- 1X (4" x 2" x 8")
- 2X (4" x 2" x 6")
Poly Top
- 2X (4" x 2" x 7")
- 3X (4" x 2" x 6")
- 2X (2" x 2" x 6")
Lead
50 lead bricks
- (49) 4" x 1" x 8"
- (1) 4" x 2" x 8"
BorAl
Needs to be calculated based off of new setup
First Built Design