PAS Feasibility Preliminary Runs: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
'''This experimental setup does not contain BorAl''' | '''This experimental setup does not contain BorAl''' | ||
General run plan | General run plan | ||
Revision as of 15:37, 17 July 2021
This experimental setup does not contain BorAl
General run plan
- Run source in and source out in experimental setup and background subtract with NaI
- Move the source to different locations along the source tunnel and plot the different distances and count rates
- Run source in and source out in experimental setup and background subtract with He3
- Move the source to different locations along the source tunnel and plot the different distances and count rates
I will upload some models of the setup when I have updated the model to include the source and detector