PAS Feasibility Preliminary Runs: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Harpconn (talk | contribs)
No edit summary
Harpconn (talk | contribs)
No edit summary
Line 13: Line 13:
:* Move the source to different locations along the source tunnel and plot the different distances and count rates
:* Move the source to different locations along the source tunnel and plot the different distances and count rates


 
I will upload some models of the setup when I have updated the model to include the source and detector





Revision as of 15:36, 17 July 2021

This experimental setup does not contain BorAl


General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
  • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
  • Move the source to different locations along the source tunnel and plot the different distances and count rates

I will upload some models of the setup when I have updated the model to include the source and detector




PAS Feasibility Study Runs