Difference between revisions of "PAS Feasibility Preliminary Runs"

From New IAC Wiki
Jump to navigation Jump to search
Line 13: Line 13:
 
:* Move the source to different locations along the source tunnel and plot the different distances and count rates
 
:* Move the source to different locations along the source tunnel and plot the different distances and count rates
  
 
+
I will upload some models of the setup when I have updated the model to include the source and detector
  
  

Revision as of 15:36, 17 July 2021

This experimental setup does not contain BorAl


General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
  • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
  • Move the source to different locations along the source tunnel and plot the different distances and count rates

I will upload some models of the setup when I have updated the model to include the source and detector




PAS Feasibility Study Runs