Difference between revisions of "PAS Thermalizing Box Design"

From New IAC Wiki
Jump to navigation Jump to search
Line 16: Line 16:
  
 
This design is preliminary and subject to change. No BorAl shielding has been included.
 
This design is preliminary and subject to change. No BorAl shielding has been included.
 +
 +
==7/12/21==
 +
 +
File:CH PAS Pb tunnel v21 Gd Converter.png
 +
 +
File:CH PAS Pb Tunnel v21.png
  
 
=Poly=
 
=Poly=

Revision as of 17:34, 12 July 2021

3D Models

For all models:

  • Red - Lead brick
  • White - Regular poly
  • Green - Borated Poly


7/6/21

Render of top down view of preliminary experimental setup


This design is preliminary and subject to change. No BorAl shielding has been included.

7/12/21

File:CH PAS Pb tunnel v21 Gd Converter.png

File:CH PAS Pb Tunnel v21.png

Poly

Sizes needed for thermalizing box

  • 2" x 6.75" x 4"
  • 2" x 8" x 4"
  • 2" x 4" x 4"
  • 1.75" x 4" x 8"
  • 12" x 2" x 7"
    • These are the base and roof plates

These are now all wrong and will need to be redesigned

Lead

  • 4" x 1" x 8" (x12)
    • The lead is layered beneath, around the outside, and on top of the thermalizing box

The lead base is 4 bricks

The outside is covered by 5 bricks (on 1" x 4" side (upright))

The top is covered by 3 bricks

BorAl


PAS_Experimental_Setup