* Began BorAl attenuation measurements including overnight background runs | * Began BorAl attenuation measurements including overnight background runs | ||
+ | |||
+ | ==6/26/21== | ||
+ | |||
+ | * First BorAl background run lasted 60000 seconds and ended at approximately 11:45am 6/26/21 | ||
+ | |||
+ | * Continuing to run Borated Poly attenuation measurements with BorAl surrounding He3 tube | ||
=='''July'''== | =='''July'''== |
Revision as of 18:13, 26 June 2021
Timeline
This page will be used to document when each task is completed as a master reference for all work logged in the wiki. The plan is to make things easier when I need to pull things in the future.
May
5/10/21
- Attended intern orientation for first day at INL
- Completed training this week as well as began NaI plateau setup
5/18/21
- Began data collection for NaI plateau and operating point measurements
- Began writing analysis code for NaI plateau measurements
June
6/8/21
- Finished collection and analysis of NaI detector plateau measurements, voltages ranging from 700V to 1400V
- Analysis included Souce in & Source out plots, Signal:Noise, and background subtracted plots
6/9/21
- Began data colleciton for He3 Borated Poly attenuation study
6/11/21
- Finished data collection for He3 Borated Poly attenuation study
- Began writing analysis code for Borated Poly attenuation study
6/22/21
- Finished writing analysis code for He3 Borated Poly attenuation measurements and submitted plot to Paul
6/25/21
- Began BorAl attenuation measurements including overnight background runs
6/26/21
- First BorAl background run lasted 60000 seconds and ended at approximately 11:45am 6/26/21
- Continuing to run Borated Poly attenuation measurements with BorAl surrounding He3 tube