Difference between revisions of "CH Task List"

From New IAC Wiki
Jump to navigation Jump to search
Line 11: Line 11:
 
* NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
 
* NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
  
* Begin experimental setup in clean room  
+
* Begin experimental setup in clean room (X)
  
 
* Find signal to noise ratio
 
* Find signal to noise ratio

Revision as of 21:20, 3 June 2021

Notes from biweekly meetings

5/27/21

To do list

  • Add dual timer configuration to plateau page (X)
  • Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots
  • NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
  • Begin experimental setup in clean room (X)
  • Find signal to noise ratio
  • Test HPGe detector
  • Complete latest assigned training module (X)
  • Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
  • How much lead to shield 200KeV gamma? How much poly to thermalize 2MeV neutrons? (DD generator shielding)
  • Move painted lead bricks to clean room (X)



PAS_Experiment