CH Task List: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Harpconn (talk | contribs)
No edit summary
Harpconn (talk | contribs)
No edit summary
Line 24: Line 24:




{| role="presentation" class="wikitable mw-collapsible"
 
| <strong>Lorem ipsum</strong>
|-
| Lorem ipsum dolor sit amet
|}


----
----
[[PAS_Experiment]]
[[PAS_Experiment]]

Revision as of 18:53, 1 June 2021

Notes from biweekly meetings

5/27/21

To do list

- Add dual timer configuration to plateau page

- Continue to fine tune operating point of NaI detector

- NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))

- Begin experimental setup in clean room

- Find signal to noise ratio

- Test HPGe detector

- Complete latest assigned training module (X)

- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)

- How much lead to shield 200KeV gamma? How much poly to thermalize 2MeV neutrons? (DD generator shielding)




PAS_Experiment