CH Task List: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Harpconn (talk | contribs)
Harpconn (talk | contribs)
No edit summary
Line 19: Line 19:
- Complete latest assigned training module
- Complete latest assigned training module


- Spoke to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU
- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)


----
----
[[PAS_Experiment]]
[[PAS_Experiment]]

Revision as of 19:59, 28 May 2021

Notes from biweekly meetings

5/27/21

To do list

- Add dual timer configuration to plateau page

- Continue to fine tune operating point of NaI detector

- NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))

- Begin experimental setup in clean room

- Find signal to noise ratio

- Test HPGe detector

- Complete latest assigned training module

- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)


PAS_Experiment