Line 14: | Line 14: | ||
- Will use 15 OSLs from reproducibility study to make sure that dose is within acceptable range | - Will use 15 OSLs from reproducibility study to make sure that dose is within acceptable range | ||
+ | |||
+ | :{| border="2" style="text-align:center;" |cellpadding="20" cellspacing="0 | ||
+ | |- | ||
+ | | Shot # ||Start Time || End Time || Number of Pulses || Number of OSLs || Beam Current | ||
+ | |- | ||
+ | | 1 ||7:00am || 7:05am || 2 || 1 || mA | ||
+ | |- | ||
+ | | 2 ||7:10am || 7:15am || 2 || 1 || mA | ||
+ | |- | ||
+ | | 3 ||7:20am || 7:25am || 2 || 1 || mA | ||
+ | |- | ||
+ | | 4 ||7:30am || 7:35am || 2 || 1 || mA | ||
+ | |- | ||
+ | | 5 ||7:40am || 7:45am || 2 || 1 || mA | ||
+ | |- | ||
+ | | 6 ||7:50am || 7:55am || 2 || 1 || mA | ||
+ | |- | ||
+ | | 7 ||8:00am || 8:05am || 2 || 16 || mA | ||
+ | |- | ||
+ | | 8 ||8:10am || 8:15am || 2 || 16 || mA | ||
+ | |- | ||
+ | | 9 ||8:20am || 8:25am || 2 || 16 || mA | ||
+ | |- | ||
+ | | 10 ||8:30am || 8:35am || 2 || 16 || mA | ||
+ | |- | ||
+ | | 11 ||8:40am || 8:45am || 2 || 16 || mA | ||
+ | |- | ||
+ | |} | ||
'''Experiment''' | '''Experiment''' |
Revision as of 19:04, 30 May 2018
Beam Line info
0 degree line
Aluminum window = 0.5mm thick. Radius = 23.813mm
Air gap between Aluminum window and glass slide = 45mm
Glass slide Thickness = 1mm
Run Plan
To find operating point
- Will use 15 OSLs from reproducibility study to make sure that dose is within acceptable range
Shot # Start Time End Time Number of Pulses Number of OSLs Beam Current 1 7:00am 7:05am 2 1 mA 2 7:10am 7:15am 2 1 mA 3 7:20am 7:25am 2 1 mA 4 7:30am 7:35am 2 1 mA 5 7:40am 7:45am 2 1 mA 6 7:50am 7:55am 2 1 mA 7 8:00am 8:05am 2 16 mA 8 8:10am 8:15am 2 16 mA 9 8:20am 8:25am 2 16 mA 10 8:30am 8:35am 2 16 mA 11 8:40am 8:45am 2 16 mA
Experiment
85 Nanodot OSLs for use (dose not include OSLs from reproducibility study)
- upper limit of OSLs is 15Gy, want to be around 7.5Gy with multiple pulses
Machine: 25b Linac
Beam Energy: 8 MeV
Rep Rate: Max (150Hz)
Will talk to engineers about double pulsing and guaranteeing number of pulses and update.
Shot # Start Time End Time Number of Pulses Number of OSLs Beam Current Aluminum Brick 1 7:00am 7:05am 2 1 mA Out 2 7:10am 7:15am 2 1 mA Out 3 7:20am 7:25am 2 1 mA Out 4 7:30am 7:35am 2 1 mA Out 5 7:40am 7:45am 2 1 mA Out 6 7:50am 7:55am 2 1 mA Out 7 8:00am 8:05am 2 16 mA In 8 8:10am 8:15am 2 16 mA In 9 8:20am 8:25am 2 16 mA Out 10 8:30am 8:35am 2 16 mA Out 11 8:40am 8:45am 2 16 mA Out
Highest single pulse simulated parameters are 25mA with 100ns pulse width.