Difference between revisions of "Linac Run Plan April 2018, Dr. McNulty"

From New IAC Wiki
Jump to navigation Jump to search
Line 5: Line 5:
  
 
Machine: 24b Linac
 
Machine: 24b Linac
 +
 
Beam Energy:  
 
Beam Energy:  
 +
 
Rep Rate:
 
Rep Rate:
  

Revision as of 19:23, 10 April 2018


Date

Machine: 24b Linac

Beam Energy:

Rep Rate:

Start Time End Time Number of OSLs Distance to end of beampipe Run Time Beam Current Aluminum Brick
7am 1 25cm 15 mins 8 MeV In




Thesis