Linac Run Plan April 2018, Dr. McNulty: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Harpconn (talk | contribs)
No edit summary
Foretony (talk | contribs)
No edit summary
Line 1: Line 1:
=Date=
Machine: 24b Linac
Beam Energy:
Rep Rate:
:{| border="2" style="text-align:center;" |cellpadding="20" cellspacing="0  
:{| border="2" style="text-align:center;" |cellpadding="20" cellspacing="0  
|-
|-
| Start Time  || Number of OSLs || Distance to end of beampipe || Run Time || Beam Energy || Beam Current || Aluminum Brick Inserted
| Start Time  || End Time || Number of OSLs || Distance to end of beampipe || Run Time || Beam Current || Aluminum Brick  
|-
|-
|7am || 1 || 25cm || 15 mins ||  8 MeV || || No
|7am || 1 || 25cm || 15 mins ||  8 MeV || In
|-
|-
|}
|}

Revision as of 19:23, 10 April 2018


Date

Machine: 24b Linac Beam Energy: Rep Rate:

Start Time End Time Number of OSLs Distance to end of beampipe Run Time Beam Current Aluminum Brick
7am 1 25cm 15 mins 8 MeV In




Thesis