Difference between revisions of "LB May 2017 Det A Efficiency"
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
{| border="3" cellpadding="5" cellspacing="0" | {| border="3" cellpadding="5" cellspacing="0" | ||
− | | Run || Source || Energy (keV) || Position || Expected Rate (Hz) ||ROOT Window || HpGe Rate (Hz) || HpGe Detector A Efficiency (%) | + | | Run || Source || Energy (keV) || Channel #||Position || Expected Rate (Hz) ||ROOT Window (by channel #) || HpGe Rate (Hz) || HpGe Detector A Efficiency (%) |
|- | |- | ||
− | ||Ba133_DetA_Farthest_DetB_posN_Efficiency.root || Ba-133 || 80.9979 || Farthest Back Position || 71455.51 || | + | ||Ba133_DetA_Farthest_DetB_posN_Efficiency.root || Ba-133 || 80.9979 || 92|| Farthest Back Position || 71455.51 || [88,98] || 36453.9 +/- 110.937 |
|- | |- | ||
|} | |} |
Revision as of 18:21, 25 August 2017
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
Det A Intercept = -12.208800 slope =1.021270
Theoretical Activities
Ba-133, 10.54 uCi on July 1, 2008, half life 10.51 years, 32.9% for 80.9979 keV line, 18.34% for 302.8508 keV line, 62.05% for the 356.0129 keV line. The sample serial # 129791 had an activity of 5.87 uCi on May 27, 2017
- for the 80.9979 keV line
- for the 302.8508 keV line
- for the 302.8508 keV line
Actual Efficiency
There is a small issue with the calibration when plotting the results in ROOT. The binning along with the calibration create a picket fencing effect that incorrectly displays the results. The effect is shown below.
Run | Source | Energy (keV) | Channel # | Position | Expected Rate (Hz) | ROOT Window (by channel #) | HpGe Rate (Hz) | HpGe Detector A Efficiency (%) |
Ba133_DetA_Farthest_DetB_posN_Efficiency.root | Ba-133 | 80.9979 | 92 | Farthest Back Position | 71455.51 | [88,98] | 36453.9 +/- 110.937 |