Difference between revisions of "LB May 2017 Irradiation Day"
Jump to navigation
Jump to search
Line 35: | Line 35: | ||
Co-60 Flag 2 : Start: 1000s Stop: 1051s | Co-60 Flag 2 : Start: 1000s Stop: 1051s | ||
− | 50% Mix : Start: 1051s Stop: | + | 50% Mix : Start: 1051s Stop: 1577.050s |
− | Co-60 Flag 3: Start: | + | Co-60 Flag 3: Start: 1577.050s Stop: 1650s |
32 MeV Beam 50 mA current 180Hz 2.2 us | 32 MeV Beam 50 mA current 180Hz 2.2 us |
Revision as of 16:13, 23 May 2017
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
5/23/17
32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA
50% Se Soil Mix
Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
5/23/17 | 50%Se-Soil DetB Outer Se Det A | 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa | 09:43:36 | 23.6cm (DetB) pos10 (DetA) |
Beam On:08:48 AM
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on real Det B time)
50%SeSoil_DetB_OuterSe_DetA_pos10.mpa
50% Soil Se: Start: 0 Stop: 500 s
Co-60 Flag 1: Start : 500s Stop : 600s
Outer Se : Start 602s Stop: 1000s
Co-60 Flag 2 : Start: 1000s Stop: 1051s
50% Mix : Start: 1051s Stop: 1577.050s
Co-60 Flag 3: Start: 1577.050s Stop: 1650s
32 MeV Beam 50 mA current 180Hz 2.2 us