Difference between revisions of "LB May 2017 Irradiation Day"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 23: | Line 23: | ||
Timer to Start Counting:  | Timer to Start Counting:  | ||
| − | Timing Cut Information for 50% Se Run (based on Det B time)  | + | ==Timing Cut Information for 50% Se Run (based on Det B time)==  | 
| + | |||
| + | 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa  | ||
| + | |||
| + | 50% Soil Se: Start: 0  Stop: 500 s  | ||
| + | Co-60 Flag : Start : 500s Stop : 600s  | ||
| + | Outer Se : Start 602s Stop: 1000s  | ||
| + | Co-60 Flag : Start  | ||
| + | |||
32 MeV Beam 50 mA  current 180Hz 2.2 us  | 32 MeV Beam 50 mA  current 180Hz 2.2 us  | ||
Revision as of 15:54, 23 May 2017
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
5/23/17
32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA
50% Se Soil Mix
| Date | Sample | Document Title | Start | Stop | Runtime (s) | Position | 
| 5/23/17 | 50%Se-Soil DetB Outer Se Det A | 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa | 09:43:36 | 23.6cm (DetB) pos10 (DetA) | 
Beam On:08:48 AM
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)
50%SeSoil_DetB_OuterSe_DetA_pos10.mpa
50% Soil Se: Start: 0 Stop: 500 s Co-60 Flag : Start : 500s Stop : 600s Outer Se : Start 602s Stop: 1000s Co-60 Flag : Start
32 MeV Beam 50 mA  current 180Hz 2.2 us