Difference between revisions of "LB May 2017 Irradiation Day"

From New IAC Wiki
Jump to navigation Jump to search
Line 13: Line 13:
 
|  Date ||Sample || Document Title ||Start || Stop || Runtime (s) || Position  
 
|  Date ||Sample || Document Title ||Start || Stop || Runtime (s) || Position  
 
|-
 
|-
||5/23/17 || 50%Se-Soil DetB Outer Se Det A || 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa || 09:43:36 ||  || ||  
+
||5/23/17 || 50%Se-Soil DetB Outer Se Det A || 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa || 09:43:36 ||  || || 23.6cm (DetB) pos10 (DetA)
 
|-
 
|-
 
|}
 
|}

Revision as of 15:48, 23 May 2017

DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


5/23/17

32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA

50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17 50%Se-Soil DetB Outer Se Det A 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa 09:43:36 23.6cm (DetB) pos10 (DetA)

Beam On:08:48 AM

Beam Off:

Timer to Start Counting:

Timing Cut Information for 50% Se Run (based on Det B time)

32 MeV Beam 50 mA current 180Hz 2.2 us