Difference between revisions of "LB May 2017 Irradiation Day"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
  
 
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
 
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
Line 7: Line 6:
 
=5/23/17=
 
=5/23/17=
  
32 MeV Beam 50 mA  current  
+
32 MeV Beam 50 mA  current after 7 minutes current came up to 80 mA
  
 
==50% Se Soil Mix==
 
==50% Se Soil Mix==

Revision as of 14:55, 23 May 2017

DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


5/23/17

32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA

50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17

Beam On:08:48 AM

Beam Off:

Timer to Start Counting:

Timing Cut Information for 50% Se Run (based on Det B time)

32 MeV Beam 50 mA current 180Hz 2.2 us