Difference between revisions of "LB May 2017 Irradiation Day"
Jump to navigation
Jump to search
| Line 1: | Line 1: | ||
| − | + | ||
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482 | DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482 | ||
| Line 6: | Line 6: | ||
=5/23/17= | =5/23/17= | ||
| + | |||
| + | 32 MeV Beam 50 mA current | ||
==50% Se Soil Mix== | ==50% Se Soil Mix== | ||
| Line 23: | Line 25: | ||
Timing Cut Information for 50% Se Run (based on Det B time) | Timing Cut Information for 50% Se Run (based on Det B time) | ||
| + | |||
| + | 32 MeV Beam 50 mA current 180Hz 2.2 us | ||
Revision as of 14:51, 23 May 2017
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
5/23/17
32 MeV Beam 50 mA current
50% Se Soil Mix
| Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
| 5/23/17 |
Beam On:08:48 AM
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)
32 MeV Beam 50 mA current 180Hz 2.2 us