Difference between revisions of "LB May 2017 Irradiation Day"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
+ | |||
+ | =5/23/17= | ||
==50% Se Soil Mix== | ==50% Se Soil Mix== |
Revision as of 14:23, 23 May 2017
32 MeV Beam 100 mA current Pulse Width 2.2 us
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
5/23/17
50% Se Soil Mix
Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
5/23/17 |
Beam On:
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)