=runs=
 
=runs=
 +
[[2nCor 44|goback]]
 
==05/16/17==
 
==05/16/17==
 
Two 4 in. by 4 in. scintillators, both placed 5 in from the Cf252 source, with one directly above and the other directly below the source. An OR between these two scinilators serves as the TDC start. The two TDC start scintilators are connected to the CFD with a HV of -1700 V and a threshold of 172 mV.
 
Two 4 in. by 4 in. scintillators, both placed 5 in from the Cf252 source, with one directly above and the other directly below the source. An OR between these two scinilators serves as the TDC start. The two TDC start scintilators are connected to the CFD with a HV of -1700 V and a threshold of 172 mV.
 +
 +
neutron detector array has the exact samne configuration used during the two runs occuring in April 2017.

Revision as of 02:31, 17 May 2017

runs

goback

05/16/17

Two 4 in. by 4 in. scintillators, both placed 5 in from the Cf252 source, with one directly above and the other directly below the source. An OR between these two scinilators serves as the TDC start. The two TDC start scintilators are connected to the CFD with a HV of -1700 V and a threshold of 172 mV.

neutron detector array has the exact samne configuration used during the two runs occuring in April 2017.