Difference between revisions of "12-23-2016"

From New IAC Wiki
Jump to navigation Jump to search
Line 15: Line 15:
 
|-
 
|-
 
|}
 
|}
 +
 +
<pre>
 +
Run 5569
 +
 +
PADC.PADC785N[15]=78
 +
ADC End of Block        fc0002b0        Event#688
 +
ADC End of Block        fc00026d        Event#621
 +
ADC Ch:0        valid=0 value=0 0
 +
PADC.PADC785N[0]=0
 +
 +
</pre>
  
 
[[2nCor_44#Run_Plan]]
 
[[2nCor_44#Run_Plan]]

Revision as of 01:31, 24 December 2016

Determine impact of Cf source on HpGe detector. A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.

Run # Configuration
5598 PAA configuration 10 uCi Na-22 and Co-60 source 32 cm from HpGe face
5599 PAA configuration Thorium welding rods on HpGe Face
5600 PAA configuration Thorium welding rods on HpGe Face changed threshold from 48 to 57 mV on HpGe trigger
5602 PAA configuration Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, 4 minute run?, 450 Hz
5603 PAA configuration Cf source on paperclip, Poly is out, HpGe face is 50 cm from Cf source, 4 minute run , 450 Hz
Run 5569

PADC.PADC785N[15]=78
ADC End of Block        fc0002b0        Event#688
ADC End of Block        fc00026d        Event#621
ADC Ch:0        valid=0 value=0 0
PADC.PADC785N[0]=0

2nCor_44#Run_Plan