Difference between revisions of "12-23-2016"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | |||
Determine impact of Cf source on HpGe detector. A measurement was done previously with the Cf source and another HpGe detector for 30 minutes. | Determine impact of Cf source on HpGe detector. A measurement was done previously with the Cf source and another HpGe detector for 30 minutes. | ||
Line 8: | Line 7: | ||
|- | |- | ||
|5599 || PAA configuration Thorium welding rods on HpGe Face | |5599 || PAA configuration Thorium welding rods on HpGe Face | ||
+ | |- | ||
+ | |5600 || PAA configuration Thorium welding rods on HpGe Face | ||
|- | |- | ||
|} | |} | ||
[[2nCor_44#Run_Plan]] | [[2nCor_44#Run_Plan]] |
Revision as of 00:38, 24 December 2016
Determine impact of Cf source on HpGe detector. A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.
Run # | Configuration |
---|---|
5598 | PAA configuration 10 uCi Na-22 and Co-60 source 32 cm from HpGe face |
5599 | PAA configuration Thorium welding rods on HpGe Face |
5600 | PAA configuration Thorium welding rods on HpGe Face |