Difference between revisions of "09-07-2016"

From New IAC Wiki
Jump to navigation Jump to search
(Replaced content with "=Background= 11.1 MeV 2nCor_44#Run_Plan")
Line 1: Line 1:
=Background=
+
Draft run plan
  
11.1 MeV
+
No target collimator open
 
+
DU cylinder target, 1” Al radiator, collimator slit open, HV -1700V,
 
+
*Find lowest thresholds to run.
[[2nCor_44#Run_Plan]]
+
(3)Study forward detector gamma flas with Pb curtains
 +
(4)Thorium strip, collimator squeeze down.
 +
(5)No target run
 +
(6)Determine how many fissions per pulse.
 +
(7)run 1 mg HEU to see (probably miserable) rates
 +
(8)Exploratory measurements with 47% HEU.
 +
(9) CFD studies
 +
(10)P.S. sweep magnet in/out
 +
(11) Long run on Thorium
 +
(12) Long run on 1 mg HEU

Revision as of 13:11, 7 September 2016

Draft run plan

No target collimator open DU cylinder target, 1” Al radiator, collimator slit open, HV -1700V,

  • Find lowest thresholds to run.

(3)Study forward detector gamma flas with Pb curtains (4)Thorium strip, collimator squeeze down. (5)No target run (6)Determine how many fissions per pulse. (7)run 1 mg HEU to see (probably miserable) rates (8)Exploratory measurements with 47% HEU. (9) CFD studies (10)P.S. sweep magnet in/out (11) Long run on Thorium (12) Long run on 1 mg HEU