Difference between revisions of "09-07-2016"

From New IAC Wiki
Jump to navigation Jump to search
(Created page with "Draft run plan No target collimator open DU cylinder target, 1” Al radiator, collimator slit open, HV -1700V, *Find lowest thresholds to run. (3)Study forward detector gam…")
 
(Replaced content with "=Background= 11.1 MeV 2nCor_44#Run_Plan")
Line 1: Line 1:
Draft run plan
+
=Background=
  
No target collimator open
+
11.1 MeV
DU cylinder target, 1” Al radiator, collimator slit open, HV -1700V,
+
 
*Find lowest thresholds to run.
+
 
(3)Study forward detector gamma flas with Pb curtains
+
[[2nCor_44#Run_Plan]]
(4)Thorium strip, collimator squeeze down.
 
(5)No target run
 
(6)Determine how many fissions per pulse.
 
(7)run 1 mg HEU to see (probably miserable) rates
 
(8)Exploratory measurements with 47% HEU.
 
(9) CFD studies
 
(10)P.S. sweep magnet in/out
 
(11) Long run on Thorium
 
(12) Long run on 1 mg HEU
 

Revision as of 13:11, 7 September 2016

Background

11.1 MeV


2nCor_44#Run_Plan