Difference between revisions of "First Board for Beam Profile"

From New IAC Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
[[File:Board_1.JPG|400px|thumb|left|Board is separated into two inch squares with mounts for an OSL at each intersection, allowing for a total of 169 OSLs to be fitted per run]][[File:Board_1_close_up.jpg|400px|thumb|center|Close up of the mounting nails and center of the board. Nails are positioned such that the center of the OSL is on the intersection, allowing for easy symmetry]]
 
[[File:Board_1.JPG|400px|thumb|left|Board is separated into two inch squares with mounts for an OSL at each intersection, allowing for a total of 169 OSLs to be fitted per run]][[File:Board_1_close_up.jpg|400px|thumb|center|Close up of the mounting nails and center of the board. Nails are positioned such that the center of the OSL is on the intersection, allowing for easy symmetry]]
  
[[File:Holes_drilled.JPG|400px|thumb|center|Holes are drilled into the board to allow dose sticks to be attached to the back of the board]]
+
[[File:Holes_drilled.JPG|400px|thumb|left|Holes are drilled into the board to allow dose sticks to be attached to the back of the board]]
 
</center>
 
</center>
  
  
 
[[HC_TriMeV]]
 
[[HC_TriMeV]]

Revision as of 22:36, 14 July 2016

Board is separated into two inch squares with mounts for an OSL at each intersection, allowing for a total of 169 OSLs to be fitted per run
Close up of the mounting nails and center of the board. Nails are positioned such that the center of the OSL is on the intersection, allowing for easy symmetry
Holes are drilled into the board to allow dose sticks to be attached to the back of the board


HC_TriMeV