Shipping Manifest:
+
=1/6/14=
  
* Thick plastic window covers used during stringing
+
Lifted 3 chambers out of the basement and put them on the ISU, temp controlled, loading dock.
* 1 stringing machine
 
* old ADB crate
 
* 1 magnet
 
  
 +
=1/8/14=
  
Order to pull equipment out that requires a crane:
+
Loaded truck for shipment to JLab.
  
1. magnet
+
=1/13/14=
2. palette
 
3. chamber
 
  
Note:
+
3 chambers arrived at JLab and were unloaded.  No obvious damage was reported.
Replace right backside wood mounting piece for boarding. Broke the one for S5 packaging and replaced with one from another set.
+
 
 +
 
 +
;Lessons for the next shipment
 +
# trim crate at least 1/2" so there is more space between the trailer wall and the crate. The 91" inch pallets were fine, need to cut a little straighter as a matter of pride and to make it easier to push onto the trailer.
 +
#be sure to cut out a section of the 3x3s so there is room for a pallet jack.
 +
#be sure white pallet drift chamber wheel blocks are at the proper locations so the chambers are aligned with the pallet.  Distance between blocks is less important since U-bolts holding the front  wheel can be moved back, but not forward.  Error may only be accommodated if the space between the front block and rear is shorter than needed.
 +
#Be sure to lift pallets with crane when pallets can't fit through the elevator
 +
#Continue to stage drift chamber on  the loading dock,  the other pallets can be placed outside,  may need to secure a location for the other pallets that contain the A-frames, magnets, and other stuff, the non-drift chamber items can be shipped in a separate shipment.
 +
 
 +
=1/17/14=
 +
 
 +
Schedule

Revision as of 17:12, 17 January 2014

1/6/14

Lifted 3 chambers out of the basement and put them on the ISU, temp controlled, loading dock.

1/8/14

Loaded truck for shipment to JLab.

1/13/14

3 chambers arrived at JLab and were unloaded. No obvious damage was reported.


Lessons for the next shipment
  1. trim crate at least 1/2" so there is more space between the trailer wall and the crate. The 91" inch pallets were fine, need to cut a little straighter as a matter of pride and to make it easier to push onto the trailer.
  2. be sure to cut out a section of the 3x3s so there is room for a pallet jack.
  3. be sure white pallet drift chamber wheel blocks are at the proper locations so the chambers are aligned with the pallet. Distance between blocks is less important since U-bolts holding the front wheel can be moved back, but not forward. Error may only be accommodated if the space between the front block and rear is shorter than needed.
  4. Be sure to lift pallets with crane when pallets can't fit through the elevator
  5. Continue to stage drift chamber on the loading dock, the other pallets can be placed outside, may need to secure a location for the other pallets that contain the A-frames, magnets, and other stuff, the non-drift chamber items can be shipped in a separate shipment.

1/17/14

Schedule