Difference between revisions of "201401 R1ProgressRep"

From New IAC Wiki
Jump to navigation Jump to search
Line 10: Line 10:
  
 
1. magnet
 
1. magnet
2.
+
2. palette
 +
3. chamber
 +
 
 +
Note:
 +
Replace right backside wood mounting piece for boarding. Broke the one for S5 packaging and replaced with one from another set.

Revision as of 19:13, 4 January 2014

Shipping Manifest:

  • Thick plastic window covers used during stringing
  • 1 stringing machine
  • old ADB crate
  • 1 magnet


Order to pull equipment out that requires a crane:

1. magnet 2. palette 3. chamber

Note: Replace right backside wood mounting piece for boarding. Broke the one for S5 packaging and replaced with one from another set.