Difference between revisions of "GEM Fission IAC 11082013"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | |||
=Runlist= | =Runlist= | ||
{| border="1" |cellpadding="20" cellspacing="0 | {| border="1" |cellpadding="20" cellspacing="0 | ||
Line 37: | Line 36: | ||
| 6609|| added attenuator of 5 dB, LED with a threshold of 120 mV,post amp no longer differentiating signal, Shutter '''Closed''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 38 Hz, | | 6609|| added attenuator of 5 dB, LED with a threshold of 120 mV,post amp no longer differentiating signal, Shutter '''Closed''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 38 Hz, | ||
|- | |- | ||
+ | |||
+ | | 6663|| attenuator of 3 dB, LED with a threshold of 217 mV,post amp integrating 500, Shutter '''Open''' V_gem= 2820 V_cath=3225, 10 Hz clock in scaler channel 5, rate was 27 Hz, | ||
+ | |- | ||
+ | | 6664|| attenuator of 3 dB, LED with a threshold of 217 mV,post amp integrating 500, Shutter '''Closed''' V_gem= 2820 V_cath=3225, 10 Hz clock in scaler channel 5, rate was 26 Hz, | ||
+ | |- | ||
+ | |||
+ | |||
|} | |} | ||
[[TGEMS#GEM_fission_chamber_tests]] | [[TGEMS#GEM_fission_chamber_tests]] |