Difference between revisions of "09/23-27/2013"

From New IAC Wiki
Jump to navigation Jump to search
Line 427: Line 427:
 
|6199 || 920 +_ 4||  3.855+_ 6
 
|6199 || 920 +_ 4||  3.855+_ 6
 
|}
 
|}
 +
 +
 +
 +
 +
[https://wiki.iac.isu.edu/index.php/IAC_runs_as_the_electron_beam_in_use]

Revision as of 14:42, 2 October 2013

09/23/13 BeamOn shutter close2.8_3.4kV

ADC : GEM CH#5, Scintillator 11

TDC: GEM CH#27,31 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6087 on 11:58:23 12:56:30 , ADC does not collect charge from the scintillator 3.4,2.8kV
6088 on 12:56:58 beam on, 3.4,2.8kV
6089 on 13:41:15 14:19:01 , 2.8,2.8kV, run included a beam off then beam on again.
6090 on 14:31:39 14:34:45 3.4,2.8kV
6091 on 14:36:29 15:20:07 43' 38" 3.4,2.8kV
6092 on 15:22:16 15:41:36 19' 20" 3.4,2.8kV
6093 on 15:42:46 16:27:24 44 38" 3.4,2.8kV
6094 on 16:28:28 16:58:48 30' 20" 3.4,2.8kV, high sci. voltage that saturate the ADC, b


09/24/13 BeamOn shutter open 2.8_3.4kV

ADC : GEM CH#5, Scintillator 11

TDC: GEM CH#27,31 (just 31 gives time hits but it is a kind of weird!!!!!), Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6095 on 09:49:48 10:35:32 beam turned off twice for a short time
6096 on 10:36:06 13:41:58 scin. ADC signal without Amplification
6097 on 13:42:41 16:49:59
6098 on 16:50:11 17:08:43

09/25/13 BeamOn shutter open 3.3,2.7kV

ADC : GEM CH#5, Scintillator 9,11

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6100 on 08:17:48 08:31:49 sci. ampl. is changed for qdc.
6101 on 08:48:59 09:04:14
6102 on 09:08:27 09:53:58 sci. ADC ch#9
6103 on 09:55:21 10:05:19 beam is off
6104 on 10:06:48 10:54:21
6105 on 10:55:08 11:43:05
6106 on 11:44:06 13:34:49
6113 on 16:28:10 16:56:49 spec. amp. 500

09/25/13 BeamOn shutter open 2.6_3.2kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6107 on 13:37:21 13:51:33 peak sensing at low channel number
6108 on 13:52:19 14:08:42 spectroscopic amplifier 100->200 coarse amp.
6109 on 14:09:21 14:55:48 spectroscopic amplifier 200->500 coarse amp.
6110 on 14:56:39 15:26:26 spectroscopic amplifier 200->500 coarse amp.
6111 on 15:30:40 15:56:29 spectroscopic amplifier 200->500 coarse amp.
6112 on 15:57:18 16:25:24 spectroscopic amplifier 200->500 coarse amp.



09/26/13 BeamOn shutter close 2.7_3.3kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6118 on 07:27:40 07:41:06 peak sensing at ch#100, but ADC still has two peaks.ch# 1374 and ch#1553! voltage of GEM = voltage of cathode = 2.7kV, osciloscope does not show any signal for GEM.
6122 on 08:22:59 09:01:28
6123 on 09:03:21 09:44:26
6124 on 09:51:51 10:22:48
6125 on 10:26:06 10:59:21 spec. amplif. changed 15-> 7.1 fine amp. 200 coarse overflow for Peak sensing
6126 on 11:02:13 11:15:37 spec. amplif. changed 7.1-> 7.4
6127 on 11:17:04 11:51:21 overflow for Peak sensing
6128 on 11:52:28 12:51:03 overflow for Peak sensing
6129 on 12:52:02 13:14:32 overflow for Peak sensing



09/26/13 BeamOn shutter close 2.6_3.2kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6133 on 13:21:00 13:24:49 peak sensing at ch#100,
6134 on 13:26:23 13:30:20 spec. amp 200->100
6136 on 13:33:18 13:43:14 9' 56" spec. amp 200->100 fine from 7.4 ->10
6138 on 13:47:19 13:57:10 10' 9"
6140 on 14:00:55 14:10:55 10'
6147 on 15:10:12 15:22:20 spec. amp fine 10->5
6148 on 15:23:16 15:38:57 spec. amp fine 5->7.4
6149 on 15:40:40 15:51:23
6151 on 15:53:13 16:04:06


09/26/13 BeamOn shutter close 2.7_3.3kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6142 on 14:14:34 14:24:37 10' 3" differetnce between the peak of the two measurements is not enough to repeat using the new spc. amp new settings but the previous settings overflow the peak sensing!!!
6144 on 14:29:47 14:40:35 10' 48"
6145 on 14:44:10 14:55:24 11' 14"
6146 on 14:56:14 15:07:50 11' 36"

09/26/13 BeamOn shutter close 2.8_3.4kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6152 on 14:12:41 16:23:54 11' 13"
6153 on 16:24:45 16:34:37 10' 48"
6156 on 16:39:16 16:49:13 9' 57"
6157 on 16:49:35 17:07:14 17'39"

09/27/13 BeamOn shutter open 2.8_3.4kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6159 on 08:38:06 08:47:59 9' 53"
6160 on 08:48:27 09:10:11 21 43"
6161 on 09:11:10 09:21:25 10' 15"
6162 on 09:23:23 09:33:18



09/27/13 BeamOn shutter open 2.7_3.3kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6163 on 09:34:52 09:42:01
6164 on 09:42:34 09:59:17
6165 on 09:59:49 10:28:55
6166 on 10:29:31 10:45:57



09/27/13 BeamOn shutter open 2.6_3.2kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6167 on 10:47:49 11:00:06
6168 on 11:00:46 11:13:33
6169 on 11:14:31 11:24:36
6170 on 11:25:15 11:29:34
6171 on 11:30:22 11:41:52


09/27/13 BeamOn shutter open 2.7_3.4kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6172 on 11:45:35 11:55:27
6173 on 11:55:49 12:03:25


09/27/13 BeamOn shutter open 2.7_3.2kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6174 on 12:04:42 12:13:11
6175 on 12:13:30 12:22:40

09/27/13 BeamOn shutter open 2.7_3.1kV

ADC : GEM CH#5, Scintillator 9

TDC: GEM CH#27,31,28 , Scintillator 29

PS-ADC: GEM CH#15


Run Number Beam Start Time End time Notes
6176 on 12:24:58 12:50:30



09/27/13 BeamOn shutter open 2.8_3.4kV

TDC settings is changed for the scintillator.

Run Number Beam Start Time End time Notes
6184 on 13:55:53 15:45:08
6185 on 15:45:46 16:00:06
6186 on 16:02:10 16:05:10 [math] V_{cath} = V_{GEM} [/math]
6187 on 16:06:26 16:19:15
6188 on 16:20:26 17:14:21 shutter is close, ended 4 min. after the beam is off [math] V_{cath} = V_{GEM} [/math]

Analysis

Main points:

  1. TDC settings, comon start, common stop mode.
  2. TDC range.
  3. changing the TDC settings. and source of TDC hits. (logic fold and dual timer and the effect of the delay)
  4. The difference in time scale between the oold and the new TDC settings (scintillator time)
  5. write a program for direct analysis of neutron spectrum based on TDC and QDC, and TDC and Peak sensing ADC.
  6. The best best GEM operating voltage as the beam is ON.
  7. difference between the TDC histograms in the two ntuple root files.


ADC Charge calibration

Using Stanford pulse generator, a pulse is injected into the ADC with an appropriate amplitude to avoid the ADC saturation. pulse width is 36.4 +_ 0.4 us.

Run Number pulse amplitude (mV) Ch#
6193 516+_ 4 2150 +_ 3
6194 624+_6 2929+_ 4
6195 724 +_ 8 3240+_ 4
6198 816+_ 8 3587+_ 2
6199 920 +_ 4 3.855+_ 6



[1]