Difference between revisions of "12 10 2012 HRRL DetectorTests"

From New IAC Wiki
Jump to navigation Jump to search
Line 2: Line 2:
  
 
Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.
 
Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.
 +
 
[[HRRL_Dec_12_2012Run]]
 
[[HRRL_Dec_12_2012Run]]
  

Revision as of 04:54, 14 December 2012

12/12/12

Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.

HRRL_Dec_12_2012Run

12/13/12

Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.

HRRL_Dec_13_2012Run