Difference between revisions of "201210 R1ProgressRep"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (Created page with "=10/01/12=  Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires).  Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2…") | |||
| Line 3: | Line 3: | ||
| Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires). | Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires). | ||
| − | Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2, 223-8 and 225-11. Guards: 227-10 and 228-3). | + | Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2, 223-8 and 225-11. Guards: 227-10 and 228-3). All wires strung were continuity tested for potential crossed wires. | 
| Sector 1 - began training stringers to turn on high voltage and look for signals using STB probe and ADB monitoring system. | Sector 1 - began training stringers to turn on high voltage and look for signals using STB probe and ADB monitoring system. | ||
Revision as of 00:01, 2 October 2012
10/01/12
Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires).
Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2, 223-8 and 225-11. Guards: 227-10 and 228-3). All wires strung were continuity tested for potential crossed wires.
Sector 1 - began training stringers to turn on high voltage and look for signals using STB probe and ADB monitoring system.