(Created page with "=10/01/12= Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires). Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2…")
 
Line 3: Line 3:
 
Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires).
 
Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires).
  
Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2, 223-8 and 225-11. Guards: 227-10 and 228-3).
+
Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2, 223-8 and 225-11. Guards: 227-10 and 228-3). All wires strung were continuity tested for potential crossed wires.
  
 
Sector 1 - began training stringers to turn on high voltage and look for signals using STB probe and ADB monitoring system.
 
Sector 1 - began training stringers to turn on high voltage and look for signals using STB probe and ADB monitoring system.

Revision as of 00:01, 2 October 2012

10/01/12

Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires).

Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2, 223-8 and 225-11. Guards: 227-10 and 228-3). All wires strung were continuity tested for potential crossed wires.

Sector 1 - began training stringers to turn on high voltage and look for signals using STB probe and ADB monitoring system.