(Created page with '=7/2/12= Strung 84 Field wires on Sector 5 (now on SL2 - row 91). Removed pretensioner C3 at row 88. Strung 41 Field wires on Sector 6 (SL1 Fields are now complete). Removed pr…') |
(→7/2/12) |
||
Line 6: | Line 6: | ||
Began visual inspection of Sector 6 before rotation. | Began visual inspection of Sector 6 before rotation. | ||
+ | |||
+ | |||
+ | =7/3/12= | ||
+ | |||
+ | Strung 84 Field wires on Sector 5 (now on SL2 - row 103). | ||
+ | |||
+ | Completed visual inspection of Sector 6. Rotated chamber, leveled stringing machine, repositioned magnet and aligned chamber for stringing Sense wires in SL2. |
Revision as of 23:37, 3 July 2012
7/2/12
Strung 84 Field wires on Sector 5 (now on SL2 - row 91). Removed pretensioner C3 at row 88.
Strung 41 Field wires on Sector 6 (SL1 Fields are now complete). Removed pretensioner C7 at row 228.
Began visual inspection of Sector 6 before rotation.
7/3/12
Strung 84 Field wires on Sector 5 (now on SL2 - row 103).
Completed visual inspection of Sector 6. Rotated chamber, leveled stringing machine, repositioned magnet and aligned chamber for stringing Sense wires in SL2.