Difference between revisions of "Beam Text May 17 2012"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 3: | Line 3: | ||
| [[https://wiki.iac.isu.edu/index.php?title=HRRL_Experiment_Readiness_Chek_List&action=edit Check List]] | [[https://wiki.iac.isu.edu/index.php?title=HRRL_Experiment_Readiness_Chek_List&action=edit Check List]] | ||
| − | 0. MATLAB emittance analysis: (working?) | + | 0. MATLAB emittance analysis: (working?) -- yes | 
| 1. Magnets: --Working | 1. Magnets: --Working | ||
| − | 2. Camera: (a)--Working, (b)--shielding-good,(c) Sync? | + | 2. Camera: (a)--Working, (b)--shielding-good,(c) Sync? -- good | 
| 3. Flags: --Working | 3. Flags: --Working | ||
| − | 4. Farady Cup: hocked up? | + | 4. Farady Cup: hocked up? --yes | 
| − | 5. Blank off for camera on? | + | 5. Blank off for camera on? --good | 
| 6. Gas bottle for valve full? --Yes | 6. Gas bottle for valve full? --Yes | ||
Revision as of 03:53, 17 May 2012
Preparation
0. MATLAB emittance analysis: (working?) -- yes
1. Magnets: --Working
2. Camera: (a)--Working, (b)--shielding-good,(c) Sync? -- good
3. Flags: --Working
4. Farady Cup: hocked up? --yes
5. Blank off for camera on? --good
6. Gas bottle for valve full? --Yes
7. Gas bottle for flags full? --Yes
8. 3 Pickup Coils (Green Torroids): (1)@gun: hocked-up; (2)@accelerator exit: hocked-up to 2 red strip wire. Now connected to linac monitor panel which labeled as "J12 from back", "Scan field Mon" from front. (3)@end of beamline: