= Getting Ready Punchlist =
 
= Getting Ready Punchlist =
 +
 
1) Get matlab ready for emittance measurement.
 
1) Get matlab ready for emittance measurement.
 +
 
2) Install control box.
 
2) Install control box.
 +
 
3) Clean up imaging system.
 
3) Clean up imaging system.
 +
 
4) Determine dipole current setting.
 
4) Determine dipole current setting.
  
 
= Emittance Test =
 
= Emittance Test =

Revision as of 16:44, 16 April 2012

Getting Ready Punchlist

1) Get matlab ready for emittance measurement.

2) Install control box.

3) Clean up imaging system.

4) Determine dipole current setting.