Difference between revisions of "PePPO 03132012"

From New IAC Wiki
Jump to navigation Jump to search
(Created page with '=Accelerator Configuration= ;Accelerator Settings {| border="1" | beam energy || 6.8 MeV |- | Beam type: || Electron |- | I_average: || 0.3 nA |- | I_peak: || 0.05<mat…')
 
Line 36: Line 36:
 
=Scope Pictures=
 
=Scope Pictures=
  
[[PictTest]]
+
 
  
 
CH1: Beam Sync
 
CH1: Beam Sync
 
 
CH2: A1
 
CH2: A1
 
 
CH3: A2
 
CH3: A2
  
Line 48: Line 46:
 
| Target|| Pictures
 
| Target|| Pictures
 
|-
 
|-
|    No Target || 1_03132012_AnnhCountScopePic.png
+
|    No Target || [[File:1_03132012_AnnhCountScopePic.png| 200 px]] [[File:2_03132012_AnnhCountScopePic.png| 200 px]]
 
|-
 
|-
|    Chromox Target||  
+
|    Chromox Target|| [[File:3_03132012_AnnhCountScopePic.png| 200 px]]  [[File:4_03132012_AnnhCountScopePic.png| 200 px]]
 
|}
 
|}
  

Revision as of 01:23, 14 March 2012

Accelerator Configuration

Accelerator Settings
beam energy 6.8 MeV
Beam type: Electron
I_average: 0.3 nA
I_peak: 0.05[math] \mu[/math] A 0.006 duty factor
pulse width: 10 [math]\mu[/math]s (it seems on 200 [math] \mu[/math]s is possible?)
Rate: 60 Hz
PEPPO Spectrometer: 151.3 A

Set HV to Detectors

Signal channel HV dac HV (V)
Detectors #1 A1 2.4 960
Detectors #2 A2 3.0 1200

How to turn HV On


Scope Pictures

CH1: Beam Sync CH2: A1 CH3: A2

Target Pictures
No Target 1 03132012 AnnhCountScopePic.png 2 03132012 AnnhCountScopePic.png
Chromox Target 3 03132012 AnnhCountScopePic.png 4 03132012 AnnhCountScopePic.png

Run Plan

Signal Definitions for Trigger logic
SYNC:=60 Hz sync pulse 200 micro seconds long
Det1:= Annihilation Counter #1 (HV1)
Det2:=Annihilation Counter #2 (HV2)


Please make the following measurements


Run# run mode Run length Beam Target Trig Logic VME discriminator Threshold (mV) HV1 (setting/V) HV2 (setting/V) PL (setting/ns) PTW (setting/ns)
sample 5 minutes e[math]^-[/math] Chromox SYNC AND (Det1 OR Det2) 50 2.4/960 3/1200 280/1120 250/1000
sample 5 minutes e[math]^-[/math] Empty SYNC AND (Det1 OR Det2) 50 2.4/960 3/1200 280/1120 250/1000
sample 10 minutes e[math]^-[/math] Chromox SYNC AND Det1 AND Det2 50 2.4/960 3/1200 280/1120 250/1000
sample 15 minutes e[math]^-[/math] Empty SYNC AND Det1 AND Det2 50 2.4/960 3/1200 280/1120 250/1000
sample 30 minutes After Beam Studies end off out (Det1 or Det2) 50 2.4/960 3/1200 280/1120 250/1000