11/1/11

70 wires were strung today. Our second stringer should be starting tomorrow.

11/2/11

91 wires were strung today.

11/3/11

The correct HVAC filters came in today. A clean filter was installed today at ~10 AM. A small rise in temperature can be seen in the temperature graph when this change was made.

77 wires were strung today.

11/4/11

91 wires were strung today.

All field wires are strung on SL2.