Revision as of 15:55, 17 October 2011
| Completion Date | IAC | Task | 
| 1/11? | IAC engineers move HRRL to new location | |
| 4/11/2011 | 2 weeks ($10 k) | Built beam pipe and flanges (Kevin?) | 
| 4/18/2011 | 2 weeks ($10k) | Chad builds and installs stands | 
| 1/11? | 2 weeks ($10k) | IAC engineers install beam line with magnets | 
| 2/11? | Hunt Runs experiment | |
| 3/11? | Sadiq emittance measurements. Beam lign misalignment was discovered. The center of the experimental cell port (hole through the wall) | |
| 7/2011 | 3 days ($1k) | Removed and reinstall Gun for alignment (Chad) | 
| 3/11? | Sadiq and Khalid disassembles beam line for alignment | |
| 3/30/11 | Order Gate Valve (4 week lead time) | |
| 4/4/11 | Complete Beam Line CAD drawing (J. Ellis) | |
| 8/2011 | 1 week Mapped one Quad (Khalid, Sadiq) | |
| 8/2011 | 3 weeks Zero degree beam line aligned (Khalid, Sadiq) | |
| 8/2011 | $500 | 1 day IAC engineers assemble pump down zero degree beam line. Gate valve and OTR Flag installed | 
| 10/2011 | 1 week Map 2nd Dipole (Khalid, Sadiq) | |
| 1/25/2012 | Target Motor from Empire Magnetics | |
| 1/25/2012 | 1 week ($5k) | Target Chamber design (IAC engineer) | 
| 1/25/2012 | Target Tungsten disks | |
| 2009-2012 | $30 k | 3 weeks of beam time | 
IAC investment: $66k
Indirects from DOE :
IAC personnel salary paid : $80k
Although not requested, magnet power supplies and a LabView control interface were installed by Chad. We were planning on using the old blue power supplies from the airport.