Difference between revisions of "HRRLPos Timeline Summary"

From New IAC Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
|3/30/11 ||  Order Gate Valve (4 week lead time)
 
|3/30/11 ||  Order Gate Valve (4 week lead time)
 
|-
 
|-
|4/4/11 ||  Complete Beam Line CAD drawing
+
|4/4/11         ||  Complete Beam Line CAD drawing
 
|-
 
|-
 
|4/11/2011 || Built beam pipe and flanges (Kevin?)
 
|4/11/2011 || Built beam pipe and flanges (Kevin?)
 
|-
 
|-
|4/18/2011 ||  Chad builds X stands
+
|4/18/2011 ||  Chad builds 4 stands
 
|-
 
|-
|7/2011 || Removed Gun for alignment (Chad)
+
|7/2011         || Removed Gun for alignment (Chad)
 
|-
 
|-
|8/2011 || Zero degree beam line aligned (Khalid, Sadiq)
+
|8/2011         || Zero degree beam line aligned (Khalid, Sadiq)
 
|-
 
|-
 
|1/25/2012 || Target Motor  from Empire Magnetics
 
|1/25/2012 || Target Motor  from Empire Magnetics
Line 21: Line 21:
 
|1/25/2012 || Target Tungsten disks
 
|1/25/2012 || Target Tungsten disks
 
|}
 
|}
 +
 +
  
 
[[Positrons#HRRL_beam_Line_installation]]
 
[[Positrons#HRRL_beam_Line_installation]]

Revision as of 17:31, 16 October 2011

Completion Date Task
3/30/11 Order Gate Valve (4 week lead time)
4/4/11 Complete Beam Line CAD drawing
4/11/2011 Built beam pipe and flanges (Kevin?)
4/18/2011 Chad builds 4 stands
7/2011 Removed Gun for alignment (Chad)
8/2011 Zero degree beam line aligned (Khalid, Sadiq)
1/25/2012 Target Motor from Empire Magnetics
1/25/2012 Target Chamber
1/25/2012 Target Tungsten disks


Positrons#HRRL_beam_Line_installation