Difference between revisions of "September 22, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
==Beam Parameters:==
 
==Beam Parameters:==
  
* current -- mA
+
* current 140 mA
* pulse width -- ns
+
* pulse width 2 ns
* rep rate -- Hz
+
* rep rate 180 Hz
* E = -- MeV
+
* E = 25 MeV
  
 
== <span style="color:red">'''Initial Test for Verification '''</span> ==
 
== <span style="color:red">'''Initial Test for Verification '''</span> ==

Revision as of 14:05, 22 September 2011

Go Back

Beam Parameters:

  • current 140 mA
  • pulse width 2 ns
  • rep rate 180 Hz
  • E = 25 MeV

Initial Test for Verification

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 25 um Al Target Comments
2--- Up
90A
In Open In Yes Out D2O buttle Test radiator in/out.

-- pulses
R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

2--- Up
90A
In Open In Yes In DU cylinder Test radiator in/out.

-- pulses
R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse
About --% of photons are coming from the radiator according to PS.

2--- Down
86A
In Open In Yes In DU cylinder Test radiator in/out.

-- pulses
R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

2--- Down
86A
In Open In Yes Out DU cylinder Test radiator in/out.

-- pulses
R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse
About --% of photons are coming from the radiator according to PS.

Production Runs

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 25 um Al Target Comments
25-- Up
90A
In Open In Yes In DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes In DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes Out DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes In None Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse


go up